As part of the Auckland region-wide Safe Speeds initiative, the project’s purpose is to install signage to reduce the speeds within the Auckland City Centre.
Auckland Transport
Roads and Transport
The project requires the contractor to install approximately 244 signs across the City Centre. Of these, approximately 44 are large Gateway signs at the 22 entrances to the CBD, and the remaining 200 signs are repeater signs within the CBD.
In addition to signage, the project also requires high friction coloured surfacing at 20 entrances to the CBD and speed tables and associated stormwater and civils works at two entrances to the CBD. system to the existing brick stormwater tunnel.
Alta’s role is Engineers Representative providing expert advice and acting as independent council for contractual arrangements between the Contractor and the Client.